November 14, 2025
Building a new home in Hanover is exciting, but the path from contract to closing can feel like a maze. You want clear steps, realistic timing, and fewer surprises. In this guide, you’ll learn how the Hanover process typically unfolds, which town boards you’ll work with, what inspections and financing milestones to expect, and how to keep your build on track. Let’s dive in.
Most new builds follow a predictable sequence even when the details vary. For a production or spec home on an already permitted lot, you often see about 4–6 months from start of construction to a Certificate of Occupancy. Custom builds or homes needing more approvals can take 7–12 months or longer. From a signed purchase agreement to closing, plan on 6–12 months depending on permitting, weather, changes, and lender timing.
Before you sign, verify how the lot fits local rules. In Hanover, zoning compliance, potential variances, and any special permits may involve the Planning Board or Zoning Board of Appeals. If the property is near wetlands or a buffer zone, the Conservation Commission may review it under the Massachusetts Wetlands Protection Act. If a septic system is required, the Board of Health will oversee Title 5 design and approvals.
Next, confirm utilities and soils. Determine if the lot has municipal water and sewer or will need a private well and septic. If septic is needed, schedule percolation testing early, since design changes can affect timing and cost. A current survey and basic soils review help avoid surprises when you move into permitting.
Once the lot checks out, you finalize plans and specs with your builder. Agree on selections, allowances, and a clear change order process so you understand cost and time impacts for any upgrades. Confirm the estimated schedule and how progress will be tracked.
Pay special attention to completion dates and whether they are estimates or firm. Ask for warranty details and how punch list items will be handled if delivery is close to your closing date. Clarify who coordinates town inspections and lender draw inspections during construction.
Your builder typically submits building permit applications, plans, and any required engineering reports. If your lot requires Conservation Commission or Planning Board hearings, expect additional steps and lead time. Timelines can change with meeting schedules and seasonal backlogs, so contact Hanover Town Hall early for current submission requirements and estimated review windows. Do not rely on generic timelines; verify what applies to your specific lot and scope.
With permits in hand, site work starts. This stage includes clearing, grading, excavation, and footings. The Building Department often requires inspections before pouring concrete and after foundation waterproofing or backfill. Weather can slow this phase, especially in New England winters, so build in buffer time if you are starting late fall or winter.
Framing, roofing, and window installation create the building shell. Mechanical, plumbing, and electrical rough work follows, with individual rough inspections for each trade. A framing inspection typically occurs before insulation goes in.
Keep communication tight during this stage. Change orders here can impact electrical layouts, HVAC ducting, and framing, which can ripple into scheduling for inspections and subsequent trades.
After rough inspections pass, insulation is installed and inspected. Drywall, paint, cabinets, and interior trim follow. Finishes depend on supply availability and trade scheduling. Massachusetts energy-efficiency requirements apply to new residential construction, and many builders participate in programs that encourage energy-smart designs.
Final mechanical, plumbing, and electrical work is completed along with flooring, appliances, and fixtures. Outside, you’ll see driveways, walks, and landscaping wrapped up. Before a certificate of occupancy is issued, you’ll need to pass final inspections for building and the licensed trades.
If your lot required Conservation Commission or Planning Board conditions, some site items may be tied to those approvals. Ask your builder which exterior items are required before occupancy and which can be deferred.
Once the Building Inspector confirms code compliance, the town issues a Certificate of Occupancy (CO). Some situations allow a temporary or conditional occupancy, but lenders often require a final CO to fund your mortgage. Plan a final buyer walkthrough close to this milestone to build a punch list of any remaining items. A small holdback or retainage may be used to cover unfinished punch list work if allowed by your contract and lender.
Many buyers use a construction-to-permanent loan. During construction, your lender releases funds based on a draw schedule. Draws are tied to inspections or third-party verification, and your builder or lender will coordinate those visits. Lenders order an appraisal and may re-inspect at completion.
In Massachusetts, closings are typically handled by an attorney who coordinates title work, recording, and disbursements. Conversion to a permanent mortgage usually happens after the final CO and all lender conditions are satisfied. Confirm your lender’s policy on temporary occupancy since many will not fund without a final CO.
Your purchase or build agreement sets the tone for the entire project. Look for clear language on the completion date and whether it is an estimate or a firm commitment. Ask if there are liquidated damages, per-day penalties, or “time is of the essence” clauses.
Request a written change order process with documented cost and time impacts. Discuss retainage or holdback options to cover punch list items at closing. Confirm warranty coverage; many builders follow a common standard of about 1 year for workmanship, 2–5 years for systems, and longer structural coverage, often around 10 years. Verify the exact terms in your contract.
Plan your final walkthrough as inspections wrap up and the CO is near. Bring your checklist and verify mechanicals, appliances, doors, windows, and finishes. Agree on a punch list, confirm the timing for completion, and discuss any holdbacks with your lender and attorney.
Coordinate utilities, homeowner’s insurance, and any HOA or road maintenance agreements if applicable. With the CO and lender conditions satisfied, you can close, pick up the keys, and move in with confidence.
New construction moves smoothly when you have a team that thrives on process and clear communication. The Guimares Group specializes in new-home and subdivision sales across the South Shore, including Hanover. You get transparency, weekly milestone photos, and organized updates that reduce stress and keep your build on track. If you want a guided, professional experience from reservation to closing, we’re ready to help.
Start your new home journey — talk to a New Construction Specialist at The Guimares Group.
Stay up to date on the latest real estate trends.
November 14, 2025
Lifestyle
November 7, 2025
Exploring Marshfield's Top Coffee Spots: A Local's Guide
November 6, 2025
Lifestyle
October 23, 2025
Explore Must-See Sights When Visiting Marshfield
October 23, 2025
Mike Guimares | October 16, 2025
New territory for Massachusetts residents, giving them options to add a accessory unit to their property which can be rented.
October 16, 2025
Lifestyle
October 9, 2025
Explore the Best Sights and Activities in Scituate, MA
Real Estate
September 29, 2025
Enhance Your Home's Efficiency and Comfort with These Top Picks
For the best service and results when it comes to all of your real estate needs, reach out anytime.